Before
Process
Result
Result
Project Description
Demolition of old cabinetsRemoval of wall and doorRemoval of flooringRelocation of electrical switches to another wallConstruction of a new wallSurface preparation for paintingInstallation of laminate flooringCustom-built cabinets to fit the designPainting of cabinetsInstallation of cabinets, hardware, and soft-close mechanismsPainting of wallsConstruction of a non-standard door frame for doors that open both waysInstallation of lighting, stops, and hooksInstallation of mirrorPainting of entrance door and replacement of hardware*Old cabinets were carefully removed and, upon the client's request, relocated to another spot.

